Cortez Hills
Owner/User: |
Barrick North America |
| Location: |
Crescent Valley, NV |
| CM/GC: |
SNC-Lavalin |
| Contact: |
Dave Evans |
| Architect: |
SNC-Lavalin |
| Structural Engineer: |
SNC-Lavalin |
| Building Engineer: |
Garco Building Systems |
| Date Completed: |
March 2010 |
| Project Type: |
Mining |
Truck Shop / Truck Wash

Description:
This was a multi-building project consisting of 10 separate pre-engineered buildings. The structural steel weight was 1,880 tons and total square footage of all 10 buildings was 135,000 square feet.
The truck shop was the largest of the buildings with an eave height of 62', a footprint of 66,200 square feet, and contained 3 overhead bridge cranes.
Sure Steel worked 48,310 man hours without a safety incident.