F/A-22 Fueled Composite Aircraft Overhaul/Test Facility
Owner/User: |
USACE / Hill Air Force Base |
| Location: |
Layton, UT |
| CM/GC: |
Big-D Construction |
| Contact: |
Rich Cox |
| Architect: |
Architectural Nexus |
| Structural Engineer: |
ARW Engineers |
| Date Completed: |
2009 |
| Project Type: |
Aviation |

Project Description:
Sure Steel was a member of the Design Build Team for this new hangar project at Hill Air Force Base as the lead for the structural design and cladding as well as the hangar doors and crane systems.
This same project Team was recently awarded Phase 2 of this project which will more than double the size and capacity of this this hangar. Construction is set to start early 2010.
|